TECHNOCOM LLC (Nestle Ukraine)
- Date 2019-2024
- Location of the facility: Kharkiv
- Construction of the pressure sewer system with earthwork operations performed, installation of an oil-drip platform, dismantling and installation of road slabs, manufacturing and equipping of a wellhole, laying pressure pipes, installation and connection of Grundfos pumps, development, supply and connection of an automation system, and so on.
- Construction activities on the repair of walls and columns in the non-residential buildings
- Renovation and finishing work in changing and shower rooms with furniture and appliances further installed
- Repair of the fire extinguishing pipeline of the finished goods warehouse and the sprinkler fire extinguishing pipeline of the warehouse
- Overhaul of interior finishing and roofing
- Mounting of flexible high-speed roller gates DYNAMICROLL FOOD INOX VERSIONE and swing fire gates.
- Installation and upgrade of ventilation and air conditioning systems (design and installation work).
- Reconstruction of the entrance group with an exit from the ground floor of the non-residential building
- Major repairs of the production unit’s flooring
